Project MRV · CarbonModel.asia

A climate outcome that can be measured and proven.

A unified digital environment for project documentation, baseline development, monitoring, calculation of emission reductions or removals, and preparation for independent verification.

ISO 14064-2 GHG Protocol VCS Version 5 Article 6
Public portfolio snapshot
Demo dataFigures are shown as an example
Expected climate impact 128.1 thousand t CO₂e / year
7 active projects
2 under verification
86% data readiness
Platform-wide navigation

7G Ecosystem

Five core products operate around a unified data core. Two specialized registries connect project outcomes with carbon unit accounting and climate claims.

Purpose

From project concept — to verified volume.

Carbon Model connects methodology, data, calculations, and evidence. Every value is linked to its source, model version, and responsible process participant.

01

Version-controlled model

Baselines, project scenarios, coefficients, and formulas are stored with a complete change history.

02

Verifiable data

The monitoring plan links each indicator to its source, frequency, quality, and supporting document.

03

Registry readiness

The verified result is generated in a structured format for the Project Registry and unit issuance.

Project cycle

Seven stages of end-to-end MRV.

The workflow covers development, monitoring, validation, verification, and transfer of the approved result to the registry domain.

01 Concept and applicability
02 Project documentation
03 Baseline and model
04 Monitoring plan
05 Monitoring and calculation
06 Validation and verification
07 Result registration
Current framework

Standards, programs, and quality principles.

The standards map is updated based on official sources. The specific set of requirements depends on the project type, jurisdiction, and selected crediting program.

Open the full standards map
Who it is for

Who Carbon Model is for.

Project-based MRV for participants of a climate project — from preparing documentation to independent verification of the outcome.

01

Project developers

Take a project from concept and project documentation to monitoring: baseline, monitoring plan, and outcome calculation — in one environment with a change history.

02

Industrial companies

Assess the climate impact of modernization and energy efficiency using accounting data from their own facilities and prepare the project for verification.

03

Verifiers

Work with a structured project package: input data with references to sources, calculation versions, a change log, and supporting documents.

Login and registration

Project work takes place
on the 7G platform

MRV is connected after the corporate GHG domain: the project baseline is built on the facility’s accounting data.

Step 1 of 2

Become a partner

Select the appropriate option so we can route your request to the right team.